Banda Group International
  • ABOUT US
    • Meet The Team
    • Our Partners
  • WHAT WE DO
    • Safety & Health
    • Environmental
    • Construction Management & Oversight
  • WORK WITH US
    • Careers
    • NAICS Codes
  • OUR PROJECTS
    • Safety & Health
    • Environmental
    • Construction Management & Oversight
  • NEWS
  • CONTACT US
Select Page

Banda Group International, LLC

Environmental Projects

  • All
  • Environmental
Planning, Fieldwork, And Reporting Associated with The Middle Delta Prime Road Project

Planning, Fieldwork, And Reporting Associated with The Middle Delta Prime Road Project

Support for Performance Assessment/Composite Analysis for MDA G

Support for Performance Assessment/Composite Analysis for MDA G

Support for Updating the 2012 Material Disposal Area (MDA) C Corrective Measures Evaluation Report

Support for Updating the 2012 Material Disposal Area (MDA) C Corrective Measures Evaluation Report

Annual Long-term Monitoring Status Report for the Los Alamos County Airport Landfill Cover System Replacement

Annual Long-term Monitoring Status Report for the Los Alamos County Airport Landfill Cover System Replacement

Characterization, Waste Packaging, and Remediation Associated with TA-21 Project

Characterization, Waste Packaging, and Remediation Associated with TA-21 Project

Implementation of The Material Disposal Area T Moisture Monitoring Pilot Study

Implementation of The Material Disposal Area T Moisture Monitoring Pilot Study

TA-33 MDA E Surveys & Preparation of Phase II Investigation Report for Chaquehui Canyon Aggregate Area

TA-33 MDA E Surveys & Preparation of Phase II Investigation Report for Chaquehui Canyon Aggregate Area

Ferrous Sulfate Cleanup, Technical Area III

Ferrous Sulfate Cleanup, Technical Area III

Environmental Due Diligence/Technical Services

Environmental Due Diligence/Technical Services

Hazardous Materials Surveys

Hazardous Materials Surveys

Technical Services Staff Augmentation

Technical Services Staff Augmentation

Sampling for the Fireball Test Non-Ignition at Rocket Sled Track Spill Area 1 & 2 – 6742 Explosive Pad B

Sampling for the Fireball Test Non-Ignition at Rocket Sled Track Spill Area 1 & 2 – 6742 Explosive Pad B

Sampling at the Thermal Treatment Unit (TTU), Technical Area III

Sampling at the Thermal Treatment Unit (TTU), Technical Area III

Mixed Waste Landfill & Evapotranspirative Cover, Technical Area III

Mixed Waste Landfill & Evapotranspirative Cover, Technical Area III

Environmental Support at Technical Area 21, Delta Prime Site Aggregate Delayed Sites Project

Environmental Support at Technical Area 21, Delta Prime Site Aggregate Delayed Sites Project

TCE Treatability Study, Technical Area V

TCE Treatability Study, Technical Area V

ABOUT US

Banda Group International, LLC is a certified Service-Disabled Veteran-Owned Small Business and a minority-owned small business.

OUR SERVICES

Safety & Health

Environmental

Construction Management & Oversight

FOLLOW US

  • Follow
  • Follow
  • Follow
  • Follow
Copyright ©2022 Banda Group International. All rights reserved. Designed & Powered by Mountain View Media